Project Phase A


Table of Contents

  1. Overview
  2. Play
  3. Documents
  4. Guidelines
  5. Others

1. Overview

In this subprocess, we deal with the Project Phase A subprocess. Project formulation consists of two sequential phases, traditionally denoted as Phases A (Concept & Technology Development) and B (Preliminary Design & Technology Completion). The primary activities in these phases are to develop and define the project requirements and cost/schedule basis and to design a plan for implementation (including an acquisition strategy, contractor selection, and long-lead procurement). While not formally a part of formulation, some formulation-type activities will naturally occur as part of earlier advanced studies. These fall into a part of the project life cycle known as Pre-Phase A (Concept Studies).

Organization: ORG


All-Files. These are all the view files.
Benefits


2. Play

In this subprocess, the play is divided in several parts:

  1. Administrative Tools.The purpose of this task is to provide basic administrative subtasks such as user and document management.
  2. Headquarters and Program Products. The purpose of this task is to provide Headquarters and Program-level products for the Flight Project.
  3. Project Technical Products. The purpose of this task is to provide Technical products for the Flight Project.
  4. Project Planning, Cost, and Schedule Products. The purpose of this task is to provide Planning, Cost, and Schedule products for the Flight Project.
  5. Key Decision Point (KDP) Readiness Products. The purpose of this task is to provide Key Decision Point (KDP) Readiness products for the Flight Project.
  6. NPR 7120.5D Project Plan-Control Plans. The purpose of this task is to provide NPR 7120.5D Project Plan-Control Plans products for the Flight Project.
  7. Review Packages. The purpose of this task is to provide Review Packages products for the Flight Project.
  8. Analysis. The purpose of this task is to generate reports from the data resulting from the subprocess.

3. Documents

In this subprocess, we have the following document types:

  1. Administrative Tools.
  2. Headquarters and Program Products.
  3. Project Technical Products.
  4. Project Planning, Cost, and Schedule Products.
  5. Key Decision Point (KDP) Readiness Products.
  6. NPR 7120.5D Project Plan-Control Plans.
  7. Review Packages
  8. Analysis

4. Guidelines

In this subprocess, we have the following roles:

NASA Administrator.
NASA Associate Administrator
Associate Administrator, PA&E
Chief Engineer
Chief Safety and Mission Assurance Officer
Chief Health and Medical Officer
Chief Financial Officer
Mission Directorate Associate Administrator
Center Director
Center Engineering Director
Program Chief Engineer
Project Chief Engineer
Lead Discipline Engineers
Project-Level Engineering Technical Authority
Program Systems Engineering Manager
Project Systems Engineering Manager
Systems Engineering and Integration Manager
Program Chief Engineer (PCE)
Project Chief Engineer (PCE)
Lead Discipline Engineer (LDE)
SMA Technical Authority
Center SMA Director
NASA Chief Health and Medical Officer (CHMO)
Phase A Manager,
Project Manager,
Deputy Project Manager,
Overall Projects Manager,
Chief Engineer,
Mission Systems Engineer,
Instrument Manager,
Observatory Manager,
Chief Safety and Mission Assurance Officer,
Mission Systems Manager,
Calibration / Validation Scientist,
Contracting Officer,
Spacecraft Systems Engineer,
Ground System Manager,
Mission Operations Manager,
Flight Operations Manager,
Task Lead,
Subtask Lead,
Reviewer,
Approval Official,
Documents Manager
Overall Projects Manager.


5. Others

In this subprocess, we have the following other tools:

Worksheet. This is the guidelines for the manager/director.
Credits. These are the people partaking in this organization's production.
References. These are other references.
All-Files. These are all the view files.